Supplier Spotlight

Video Exclusives

Stratolaunch High Speed Taxi Test

The aircraft development team for the world’s largest aircraft performed regression testing at the Mojave Air & Space Port on February 24-25, 2018. Ground speeds ranged from 10-40 knots during the test series.

Click here to watch video

21 March, 2018

Bell V-280 Valor Reaches 80 Knots

Watch the US military’s next generation tilt-rotor aircraft achieve a flight speed of 80 knots at an altitude of 1,000 feet above ground level during tests.

Click here to watch video

27 February, 2018


To watch more videos, click here

With the use of 3D-printed parts in aircraft most likely to only increase, we'd like to know if you feel your company is ready to inspect and test more 3D printed parts made from new materials for use in aerospace applications:


AEDC H2 Arc Heater team validating new test capability

To meet development and testing needs for long-range strike and hypersonic vehicle materials, the H2 Arc Heater at Arnold Engineering Development Complex (AEDC) in Tennessee has been upgraded, with checkouts being performed recently to ensure the modifications were successful.

According to Harry Clark, AEDC senior engineer with the Strategic Plans and Test Facility Requirements, this project, known as the Mid-Pressure Arc Heater Prototype project (MPAH) has been a risk reduction effort that supports the Central Test and Evaluation Investment Program (CTEIP) project upgrading the H2 arc-jet test capability.

“The Test & Evaluation, Science & Technology branch of the Test Resource Management Center identified in 2014 the opportunity to ensure the success of the MPAH project by funding the installation of a segmented arc heater in H2 and demonstrating its performance envelope,” Clark said.

“The project was funded in 2015 and has nine test conditions that comprise the Key Performance Parameter for the risk reduction effort. Successful demonstration of the KPP is required before the CTEIP project can proceed to execution.”

The facility modifications necessary to install the segmented heater in H2 were designed by AEDC engineers in 2015 and the fabrication was accomplished in 2016. Checkout of H2 began in the autumn of last year, with the first KPP test condition demonstrated successfully in December. Two more KPP conditions were demonstrated before the end of 2016 and four of the remaining six were demonstrated in January 2017. As part of the upgrade, a state-of-the-art segmented heater is being placed in the H2 Arc Tunnel to replace the vintage Huels heater.

The upgrade is necessary as hypersonic flight places extreme demands on vehicle structures and materials. Survivability testing of thermal protection system materials and structures for hypersonic environments requires high-temperature air flow with gas temperatures between approximately 4,500°F and 17,500°F.

Arc heaters are able to meet this need by providing an efficient source for heating simulations, with realistic run times that are consistent with the time of many hypersonic flight missions.

Edited by Michael Jones

February 8, 2017


Your email address:

Read Latest Issue

Read Latest Issue

Web Exclusives

 The US Navy is developing a video game to help find future operators for its remotely operated unmanned aerial vehicles.
Click here to read more

With the continued advance of simulation software, how will aerospace engineers use wind tunnels over the next 20 years?
Click here to read more

In just six months, the US Air Force publicly announced and flew its Light Attack Experiment, pitching four platforms against a series of demanding mission objectives
Click here to read more

A new flight test project led by Airbus spearheads an EU effort to see if laminar-flow wings can be produced on an industrial scale
Click here to read more

BAE Systems’ structural test team at Brough has now completed a third cycle of F-35A fatigue testing
Click here to read more

Supplier Spotlight

Supplier SpotlightClick here for listings and information on leading suppliers covering all aspects of the aerospace testing industry. Want to see your company included? Contact for more details.

Submit your industry opinion

Industry BlogDo you have an opinion you'd like to share with the aerospace testing community? Good or bad, we'd like to hear your views and opinions on the leading issues shaping the industry. Share your comments by sending up to 500 words to

Submit Your Recruitment Ad

Recruitment AdTo send us your recruitment advertising or to receive information on placing a banner please email